Stop writing longer plans. Make your teams brief you back.

2026-11-19


Stop writing longer plans. Make your teams brief you back.

November 19, 2026

When a program drifts, the reflex is more detail: more status, more instructions, more checkpoints. Stephen Bungay's argument is that this reflex is the drift, and that the fix is a fifteen-minute conversation run backwards.

Watch what happens in the week after a program slips. The plan doc grows a new appendix. The weekly status gains three fields. The steering group asks for a RAID review every Tuesday instead of every other Tuesday. Leaders want more certainty, so they ask for more information, issue more precise instructions and add more controls. Everyone works harder, and the program gets slower and more brittle, because the people closest to the problem now have less room to adapt and more reporting to do.

Stephen Bungay spent years studying why the Prussian army in the nineteenth century, and the firms he later advised, kept hitting this wall. In The Art of Action (2011) he names the failure precisely: three gaps open between plans, actions and outcomes, and the instinctive response to each one makes all three wider. His remedy isn't a better plan. It's a different contract between the person who sets direction and the people who carry it out, and the hinge of that contract is a practice almost no tech org runs on purpose: the backbrief.

For TPMs and engineering leaders, this matters more in 2026 than it did in 2011. Teams are running agents that change the cost of "how" weekly. The more the means shift underneath you, the less a detailed plan is worth, and the more a shared understanding of why is worth. Today's Deep Dive is about where intent leaks out of a program, and today's Method is the conversation that catches it.


Deep Dive — Tech Leadership: Close the Three Gaps Without Tightening the Grip

Bungay's framework starts from an observation borrowed from Clausewitz: friction is a permanent property of any organization acting in an uncertain environment. Plans, actions and outcomes never line up. He breaks the misalignment into three gaps.

The knowledge gap is the difference between what we would like to know and what we actually know. A director can't know the true state of twelve teams' work, the real shape of a legacy system or how a vendor will behave next quarter. The reflex is to demand more information: more dashboards, more status, more detail in the plan.

The alignment gap is the difference between what we want people to do and what they actually do. The director's plan says one thing, and six teams do six interpretations of it. The reflex is more detailed instructions: tighter tickets, longer specs, a RACI for every decision.

The effects gap is the difference between what we expect our actions to achieve and what they actually achieve. You shipped the migration tool and adoption stalled anyway. The reflex is more detailed controls: more checkpoints, more metrics, more approval gates.

The trap is that each reflex makes the other gaps worse. More reporting takes time from the people who would otherwise be closing the gap. More detailed instructions break the first time reality differs from the assumptions behind them, and reality always differs. More controls slow the feedback loop that would have told you the effect was wrong. Bungay's point is that the response that feels like leadership, getting a firmer grip, is the one that produces the drift.

His alternative has three parts, and each is the counterpart of a reflex.

Limit direction to intent. Instead of more detail, say less, but say the part that matters: what we're trying to achieve and why, with only the constraints that are real. A TPM version: "We need the payments service off the shared database before peak season, because a single schema migration there can currently take down checkout. We can't add headcount and we can't touch the ledger format." That's it. Not the sequence of twelve tickets.

Let each level work out its own "how," then check it. This is the backbrief. The team leads go away, think through what they'll actually do, and come back to explain their understanding of the intent and their plan in their own words. Misunderstandings surface in the room, at the cost of fifteen minutes, rather than in week nine, at the cost of a quarter.

Give people freedom to adjust within the intent. When the situation changes, people closest to it act without waiting for permission, as long as what they do still serves the stated purpose. Bungay calls the result directed opportunism: high alignment and high autonomy, which most orgs assume are a trade-off.

Three things make this harder in a tech org than Bungay's examples suggest, and they're worth naming.

First, intent is usually never written down at the level that matters. Company OKRs exist. Team tickets exist. The layer in between, "why this program, why now, what we will trade away to get it," lives in a VP's head and a slide from the kickoff. The TPM is often the only person positioned to write it, and that's a leadership act, not an admin one.

Second, engineers are trained to receive specs, not to brief back. A backbrief can feel like a test. Frame it explicitly as the leader checking their own communication: "If you can't tell it back to me, I explained it badly."

Third, the effects gap needs fast feedback, not more gates. Replace the extra approval step with a shorter loop: a weekly look at the one outcome signal the intent cares about. That keeps the control on outcomes, where it belongs, not on activity.

The leadership lesson underneath is uncomfortable. When a program drifts, the first question to ask isn't "who isn't following the plan?" It's "did I ever make the intent clear enough that they could follow it without me?"

Try this week. Pick the program you're most worried about. Write its intent in five sentences or fewer: the outcome, why it matters now, and the two or three real constraints. Then ask one team lead to brief it back to you cold, without looking at your note. Write down every point where their version differs from yours. Each difference is a gap you were about to manage with more status reports.


Method — Briefing and Backbriefing (Stephen Bungay, The Art of Action, 2011)

What it is. A two-way handover of intent: the leader briefs the purpose and constraints, then each team comes back and explains, in their own words, what they understand and what they plan to do, so both sides can correct the gaps before work starts.

When to use it. At the start of a program or a new phase; after a reorg or a change of sponsor; whenever two teams are interpreting the same goal differently; and before any work that will be hard to reverse.

How to run it:

  1. Brief the intent, not the plan. Cover the situation, what we're trying to achieve, why it matters to the level above you, and the real boundaries (budget, dates, things that can't change). Keep it short enough to fit on one page.
  2. Give teams time to think, then reconvene. Hours or a couple of days, not minutes. They need to work out the implied tasks and the "how" on their own.
  3. Run the backbrief. Each lead explains their understanding of the context and the intent, what they will do, what they need, and which constraints they think apply. The leader listens first and doesn't interrupt to correct.
  4. Close the differences on the spot. Wherever their account diverges, decide together: was the brief unclear, did they spot something the leader missed, or is the intent itself wrong? Adjust the brief, the plan or both.
  5. Repeat at each level and when things change. The team lead briefs their own team the same way. Rerun the loop at phase gates or after any surprise large enough to change the intent.

When NOT to use it. In a live incident or any situation that needs a single command decision in minutes; brief the intent in one line and save the backbrief for the retro.

Example: before a database split, the TPM briefs "off the shared DB before peak, no ledger changes," and the backbrief reveals the data team assumed "before peak" meant October code freeze, not November traffic. That's a month of misunderstanding caught in one meeting.


Field Notes

Inference engineering for software engineers — The Pragmatic Engineer (Nov 17) charts the move from frontier APIs to open-weight models on inference providers; for leaders, this turns model choice into a cost, latency and GPU-capacity decision your program plans will now have to carry.

The Pulse: What can we learn from the Railway hack? — Railway's postmortem suggests the attacker likely used "abliterated" models with safeguards removed; a reminder to put AI-assisted attacks into your threat model and incident playbooks, not just your roadmap slides.

How engineering teams are reorganizing for AI — Larridin's LDX3 New York poll (about 98 leaders) found no dominant pattern: around 41% reorganized around products or outcomes, while just as many widened manager spans as narrowed them. Small sample, but the takeaway stands: nobody has the AI-era org chart figured out yet.


Events


Reading


"Plans are worthless, but planning is everything."

— Dwight D. Eisenhower, 1957