The Miette: June July Build Update
Hello! It’s another double month build update, not by design but by necessity as we have been working hard to make this tiny house more of a reality.
June saw us work on our kitchen cabinets while we wait for the professionals and buying an HRV system, and July saw us getting all our insulation done! We watched many hours of Tour de France and as Lys writes this the Olympics is on in the background, so we are feeling very inspired watching others achieve their goals. Let’s dive right in!
June: Diving, Riding and Cutting Back into the Build
June went by in a blur to be frank, almost as if we had just stepped off the plane from Indonesia and immediately jumped back into our tiny house project. The month was largely dedicated to designing and constructing our kitchen cabinets, which as always is a lot harder than it looks. There is good reason why kitchen renovations are expensive, top quality finishes are hard to achieve without practice and patience. Even an IKEA kitchen is over $2000!
We found ourselves watching countless YouTube videos to grasp the finer points of cabinetry. Specifically, we also drew inspiration from Scott Brown Carpentry’s plywood kitchen video.
Our kitchen is unlikely to look as nice as his (for one, he is not looking to minimise weight at every turn) but it is wonderful inspiration. We have found overall, it’s an intricate process, requiring a whole new level of detail, very different to building the frame and the like. If building is the broad brush strokes of the canvas, then building cabinets is the final detail work, with the small brush. One of the challenges we faced was how easily plywood scratches. Drop something on it — it scratches, Lean on it — it scratches. Look at it — it scratches. Unfinished plywood is such a stressful material to work with…
See the photos and read more here!