|
|
Wednesday
18 Nov 2026 · Nº 322
The signal and the summaries below are generated by an AI system (Art. 50 of Regulation (EU) 2024/1689).
|
|
Signal
The EU is attacking renewables deployment from the permitting bottleneck (RED III/IV grid-connection deal) while a €468bn warning to Germany underscores that build-out speed, not ambition, is now the binding constraint. Yet demand-side and supply-side fragilities persist—from just 700 tonnes of green hydrogen counted toward German transport quotas to solar module oversupply crushing prices—revealing a gap between accelerating policy frameworks and sluggish real-world uptake.
|
RED III/IV · EU · PV Magazine
The Council and the European Parliament have provisionally agreed on new rules to speed up permitting and grid-connection procedures for renewable projects across the bloc, according to PV Magazine. Member states would have 18 months to transpose the directive into national law once it is formally adopted. The agreement is provisional and still requires final sign-off by both institutions.
|
Hydrogen · EU · Hydrogen Insight
The European Commission has fixed a date for the fourth auction round under the European Hydrogen Bank, according to Hydrogen Insight. The scheme awards fixed-premium subsidies per kilogram of renewable hydrogen to winning producers. Full terms and budget details were not included in the snippet.
|
RED III/IV · DE · Hydrogen Insight
Germany has credited close to 700 tonnes of green hydrogen against its national greenhouse-gas reduction quota for transport fuels, Hydrogen Insight reports. The figure reflects renewable hydrogen actually counted under the quota mechanism that transposes EU renewables rules into German fuel law.
|
Industrial Policy · FR · PV Magazine
France's energy regulator has set out the terms for a 500 MW technology-neutral tender covering solar, wind and hydropower, according to PV Magazine. The proposed rules use an unweighted reference price, which the report says raises concerns over market risk, financing costs and limited PV participation.
|
Batteries · DE · Charged EVs
BMW has added Samsung SDI as a Gen6 cell supplier in Europe and LG Energy Solution for the US, according to Charged EVs. The sourcing split aligns cell supply with regional vehicle production. No pricing, volume or cell-chemistry performance figures were given in the report.
|
Industrial Policy · EU · PV Magazine
In an interview with PV Magazine, Search4Solar CEO Bart Wansink said surplus modules from cancelled projects, high inventory and Chinese manufacturing reforms are weighing on European module prices. He expects prices to stabilise in 2027, though persistent oversupply could keep pressure on. The outlook is one analyst's forecast, not a market consensus.
|
Grids Package · DE · Recharge News
Recharge News reports that Germany faces a roughly $468bn cost if it fails to accelerate its wind build-out, citing analysis flagging the gap between targets and delivery. The figure is a modelled estimate tied to delays rather than a confirmed liability. Grid bottlenecks are cited as a core constraint.
|
|
The morning board
|
Ammonia · unabated fossil
Conventional SMR · $/t NWE · undated
|
688.25 |
|
Ammonia · low-carbon
SMR + CCS · $/t NWE · undated
|
738.92 |
|
Ammonia · RFNBO
Renewable electrolysis · $/t NWE · undated
|
839.16 |
|
EUA
EEX primary auction · 2026-11-17 · €/tCO₂
|
87.15 |
|
DE Baseload
Day-ahead · €/MWh
|
224.83 |
|
Gas — THE day-ahead (DE hub)
THE day-ahead, German hub (≈ TTF + 1–3 €/MWh) · EEX via Bundesnetzagentur · 2026-11-17 · €/MWh
|
85.77 |
Sources: a licensed price assessment (NH₃, not public) · SMARD.de · EEX · Bundesnetzagentur · IMF · Full board →
|
Stay ahead of the rewiring.
Markets, Politics, the RFNBO simulator and the full archive.
|
|
Rewire.
Markets · Politics · RFNBO
|
The summaries in this briefing are generated by an AI system (Art. 50 of Regulation (EU) 2024/1689). Rewire. · Tobias Janning · Rahlstedter Straße 171 · 22143 Hamburg · Legal notice & privacy. You can unsubscribe at any time with the link at the very bottom of this e-mail. For informational purposes only. Not investment, legal, or regulatory advice. No liability assumed. Views are the author's own.
|