Rewire.

Rewire.

Archives
Log in
Subscribe
November 6, 2026

Rewire. #310 — Friday, 06 Nov 2026

Rewire. — Morning Briefing
Friday   06 Nov 2026 · Nº 310
The signal and the summaries below are generated by an AI system (Art. 50 of Regulation (EU) 2024/1689).
Signal
Europe's hydrogen economy is bifurcating as 550MW of Dutch subsidised projects collapse while Everfuel secures €245m in German backing for a 200MW Danish electrolyser—a sign that cross-border subsidy competition, not blanket demand, now determines which RFNBO projects survive to meet RED III's 42% industrial target. Meanwhile, grid constraints remain the binding bottleneck, with Spain curtailing more renewables than any other EU state even as Germany debates how to finance its distribution build-out.
AI-generated illustration: the groundbreaking reversed: the only earth these projects ever moved was ceremonial, and now even the commemorative spade is being pulled back out, leaving the heap raked flat.
Hydrogen · NL · Hydrogen Insight
Dutch minister confirms 550MW of subsidised green hydrogen projects cancelled
According to Hydrogen Insight, the Dutch energy minister has confirmed that green hydrogen projects totalling 550MW, which were awarded substantial subsidies back in 2022, have been scrapped. A companion report questions how much of the billions of euros earmarked for Dutch hydrogen projects has actually been disbursed. The figures and cancellations stem from the minister's own statements as reported by the outlet.
RFNBO · Industrial Policy Source ↗
Hydrogen · DE · Hydrogen Insight
Everfuel signs €245m German subsidy contract for 200MW electrolyser in Denmark
Hydrogen Insight reports that Everfuel has signed a €245m German green hydrogen subsidy agreement to support a planned 200MW electrolyser project located in Denmark. The arrangement reflects cross-border support where German funds back production capacity sited in a neighbouring member state.
RFNBO · Industrial Policy Source ↗
Grids Package · DE · Agora Energiewende
Agora Energiewende publishes analysis on financing Germany's distribution grid build-out
Agora Energiewende released a publication dated 5 November 2026 examining how Germany should finance the expansion of its electricity distribution grids. The analysis addresses the investment burden required to accommodate rising electrification and distributed renewable generation at the distribution level.
Industrial Policy Source ↗
RED III/IV · EU · Hydrogen Insight
Electric Hydrogen argues how Europe can meet RED III's 42% industrial RFNBO target
In an interview with Hydrogen Insight, an executive from Electric Hydrogen sets out the company's view on how the EU can make the RED III target — requiring 42% of industrial hydrogen to be RFNBO — achievable. The piece is a single-company perspective and presents arguments rather than new regulatory decisions.
RFNBO · Industrial Policy Source ↗
Grids Package · ES · El Periódico de la Energía
Spain curtails more renewable energy than any other EU member state on grid congestion
El Periódico de la Energía reports that Spain wastes more renewable electricity than any other EU country because of grid congestion and connection bottlenecks. The outlet attributes the curtailment to the state of the transmission and distribution network rather than to generation oversupply.
Industrial Policy Source ↗
Industrial Policy · ES · El Periódico de la Energía
Bayer to electrify aspirin production in Asturias with renewable steam from Iberdrola
El Periódico de la Energía reports that Iberdrola has begun trials to supply Bayer's pharmaceutical production in Asturias with 100% renewable steam, electrifying a process previously reliant on fossil heat. The report describes the project as in a testing phase.
Source ↗
Industrial Policy · EU · PV Magazine
Longi reports certified 35.25% efficiency perovskite-silicon tandem cell
PV Magazine reports that Longi has achieved a certified 35.25% efficiency (headline figure 35.31%) on a perovskite-silicon tandem solar cell using self-assembled molecules to improve interface quality, with the device retaining 94% of initial efficiency after 1,500 hours. The claim is a laboratory cell result disclosed by the manufacturer; this is a research-stage announcement, not a commercial module.
Source ↗
The morning board
Ammonia · unabated fossil
Conventional SMR · $/t NWE · undated
688.25
Ammonia · low-carbon
SMR + CCS · $/t NWE · undated
738.92
Ammonia · RFNBO
Renewable electrolysis · $/t NWE · undated
839.16
EUA
EEX primary auction · 2026-11-06 · €/tCO₂
87.51
DE Baseload
Day-ahead · €/MWh
275.64
Gas — THE day-ahead (DE hub)
THE day-ahead, German hub (≈ TTF + 1–3 €/MWh) · EEX via Bundesnetzagentur · 2026-11-05 · €/MWh
91.86
Sources: a licensed price assessment (NH₃, not public) · SMARD.de · EEX · Bundesnetzagentur · IMF · Full board →
Stay ahead of the rewiring.
Markets, Politics, the RFNBO simulator and the full archive.
Open Rewire. →
Rewire.   Markets · Politics · RFNBO
The summaries in this briefing are generated by an AI system (Art. 50 of Regulation (EU) 2024/1689). Rewire. · Tobias Janning · Rahlstedter Straße 171 · 22143 Hamburg · Legal notice & privacy. You can unsubscribe at any time with the link at the very bottom of this e-mail. For informational purposes only. Not investment, legal, or regulatory advice. No liability assumed. Views are the author's own.
Don't miss what's next. Subscribe to Rewire.:
← Newer Rewire. #314 — Tuesday, 10 Nov 2026 Older → Rewire. #309 — Thursday, 05 Nov 2026
LinkedIn
Powered by Buttondown, the easiest way to start and grow your newsletter.