Your platform isn't losing on features. It's losing to habit.

2026-11-25


Your platform isn't losing on features. It's losing to habit.

November 25, 2026

Most stalled internal migrations are treated as a supply problem. They are a demand problem, and Jobs-to-be-Done gives you the instrument to see it.

Every large engineering org has one: the internal platform that is technically better than what it replaces and still sits at 30% adoption two quarters after launch. The usual response is to ship more. Another golden path, another integration, a nicer CLI, and eventually a mandate with a deprecation date. The program review asks "what features are blocking adoption?" and the backlog answers on cue.

That question assumes teams are comparing feature lists. They mostly aren't. Bob Moesta and Chris Spiek, who built the Jobs-to-be-Done interviewing practice with Clayton Christensen's ideas as a foundation, describe a switch with one inequality: "Push + Pull > Anxiety + Habit." People move when the pain of the current way and the attraction of the new way together outweigh their fear of the unknown and the comfort of what they already do. Features only touch one of those four terms. Most platform programs spend 90% of their effort on Pull and almost none on the two forces that are actually holding teams in place.

This matters more in 2026 than it did three years ago, because the biggest internal switch most of us are running right now is not a platform. It's the move to agentic development. GitHub's Octoverse 2026 report says agents opened more than 40% of pull requests in September, up from 17% in March. The adoption curve is steep, but it's uneven, and the unevenness is a demand story. Today's Deep Dive is about how to read it.


Deep Dive — Design Thinking & Discovery: Treat Every Internal Switch as a Job

Jobs-to-be-Done (JTBD) says customers don't buy products. They "hire" them to make progress in a particular circumstance, and they "fire" whatever they used before. Christensen made the idea famous in Competing Against Luck (2016). Moesta and Spiek made it practical with the switch interview and the four forces of progress: Push (the problem with the current situation), Pull (the magnetism of the new way), Anxiety (fear of the unknown), and Habit (the comfortable inertia of what people already do).

Senior TPMs and eng leaders tend to file JTBD under "product stuff." That's a mistake. Any program that asks other teams to change how they work is selling something, whether it's a deploy pipeline, an observability stack, a new planning process, or a coding agent. Your customers just can't take their money elsewhere, so you never hear them say no. You see it later, as adoption that stalls quietly.

Three shifts make JTBD useful at program scope.

1. Measure the job, not the task. Abi Noda's summary of Google's "Measuring Developer Goals" research on the DX newsletter is the best example I know of JTBD applied to internal tooling at scale. Google found that "searching for documentation" is a task, while the goal behind it might be "understand the context to complete a work item." Tasks change every time the tooling changes. Goals stay stable for years. Google also reworded "code review" as "ensure the code contributed by others (e.g., teammates, AI, etc.) is high quality." That rewording opens a whole design space that a "faster code review" OKR hides. If your platform's success metric is a task ("% of services on the new CI"), you'll optimize the migration. If it's a job ("ship a change to production without waiting on another team"), you'll find out whether the migration helps at all.

2. Diagnose the forces before you add features. A stalled rollout almost always has one dominant force, and the fixes for each are completely different. Weak Push: the old way doesn't hurt enough yet, so a sharper pitch won't help, and the honest move may be to wait or target the teams who do feel the pain. Weak Pull: teams can't picture their own life on the new thing, so show a peer team's before-and-after, not a slide of capabilities. High Anxiety: "what happens to my on-call if this breaks?" calls for rollback paths, a shadow-mode period, or a named person who'll carry the pager with them the first week. Strong Habit: muscle memory, scripts, runbooks, and tribal knowledge built around the old way. Here you migrate the scripts for them, keep the old commands working as aliases, and accept that this is plumbing work, not marketing.

3. Interview the switchers and the almost-switchers. The best evidence isn't in a satisfaction survey. It's in the stories of teams who moved last month, and of teams who started and quietly reverted. Ask them to walk you backwards through what happened, from the first moment they thought "we should look at this." Adora Nwodo, a staff-level platform engineering manager, made the same point on the Stack Overflow blog: platform tools go unused when "discovery was skipped," and "feedback ≠ requirements." You want the last real story of the problem, not a feature request.

Now apply this to AI adoption, because the current data reads like a four-forces diagram. The LeadDev AI Code Review Report 2026, sponsored by CodeRabbit (vendor-backed, 377 engineers and leaders surveyed), found that 7 in 10 engineers don't fully understand the AI-generated code they approve. 47% use the same agents that wrote the code to review it, and only 14% have consistent review standards. That isn't a Pull problem: generation is clearly attractive. It's unmanaged Anxiety that has turned into a new Habit, where people rubber-stamp because "nobody can read all of that line by line," as CodeRabbit's CEO Harjot Gill told VentureBeat. A program that responds by rolling out a better model is adding Pull to a system that's stuck on the other two forces.

Chris Richardson argued on microservices.io in March that adopting coding agents is a Cynefin-complex problem, and that "a policy factory approach freezes learning too early." JTBD gives you a way to listen before you codify anything. Find out what job each team is actually hiring the agent to do. "Clear the toil tickets nobody wants" and "prototype the risky design in a day" are different jobs, with different forces and different review needs. One policy won't fit both.

Try this week. Pick the internal rollout you own that's stalled furthest below plan. Find two teams that adopted in the last 90 days and one that started and reverted. Book 45 minutes with each and ask a single opening question: "When did you first start thinking about changing how you did this?" Afterwards, sort every quote into Push, Pull, Anxiety, or Habit. If most of the reverting team's quotes land in Anxiety or Habit, take the next feature off the roadmap and put that capacity into a rollback path or a script migration instead.


Method — The Switch Interview and the Four Forces of Progress (Bob Moesta and Chris Spiek, Re-Wired Group)

What it is. A one-on-one interview that reconstructs, event by event, how someone recently switched from one way of doing something to another, and then codes the story into the four forces: Push, Pull, Anxiety, and Habit. Moesta and Spiek developed the four forces as part of their JTBD interviewing method. Their own site notes that the model is "frequently (mis)attributed," so credit them.

When to use it. An internal platform, process, or tool has launched and adoption is uneven. Leadership is debating a mandate. You're about to invest another quarter in features and you can't say which force is actually holding teams back. It also works well before a launch, if you interview teams who recently adopted a comparable tool elsewhere in the company.

How to run it:

  1. Recruit recent switchers, including the almost-switchers. Pick teams who changed in the last 30 to 90 days, while memory is fresh, plus at least one team who started and backed out. Five to eight interviews for a single job is usually enough for patterns to show.
  2. Set the stage as documentary, not evaluation. "We're trying to understand what actually happened, not grade the platform." Make it clear there's no right answer, and don't let the platform team's lead run the interview.
  3. Anchor on the first thought, then walk the timeline. Open with "When did you first start thinking about this?" Then move through the stages: first thought, passive looking, the event that made it urgent, active looking, deciding, and the switch itself. Ask for specifics: who was in the room, what broke that week, what got said in standup.
  4. Listen for the forces, in their words. Log every quote under Push, Pull, Anxiety, or Habit. Don't paraphrase. "I didn't want to be the one paged at 2am on a system I'd used twice" is a better design input than "reliability concerns."
  5. Synthesize across interviews and pick the binding force. Lay the coded quotes side by side and name the single force that most often decided the outcome. Then redirect the next increment of program capacity at that force, not at whatever feature is next on the roadmap.

When NOT to use it. Skip it when the switch is genuinely non-negotiable on a fixed date, such as a compliance cutover or an end-of-life vendor contract. Interviewing people about a choice they don't have reads as theater. Use a migration risk register then, and save the switch interviews for after the cutover, to learn what to fix next time.

Illustrative example (hypothetical): a platform team assumed slow adoption of its new deploy pipeline came down to missing canary features. Six interviews showed the deciding force was Habit. Every team had years of shell scripts wrapped around the old pipeline. A two-week script-migration sprint moved adoption more than the previous quarter of features had.


Field Notes

Nearly half of surveyed engineers and leaders say the AI agents that write their code also review it — Sean Michael Kerner covers the LeadDev/CodeRabbit report (Nov 24). 45% name code review as the biggest bottleneck, and only 18% say reviewers have enough context to judge architectural impact. If you own engineering quality, the review job needs its own discovery, not just another tool.

"Agents are very harsh customers" — Microsoft's Charles Lamanna argues that agents will become the main client of a lot of software. For platform leaders, that means a second customer whose jobs and failure modes you should be interviewing for (through traces), alongside your human developers.

Why GenAI-based coding agents are a complex domain in Cynefin — Chris Richardson's case for making your platform "a learning amplifier, not a policy factory" for agent adoption. Read it next to today's Deep Dive before you write next year's AI usage standards.


Events


Reading


"People don't want to buy a quarter-inch drill. They want a quarter-inch hole!"

— Theodore Levitt, as quoted by Clayton Christensen, Scott Cook and Taddy Hall in "Marketing Malpractice," Harvard Business Review (2005)


Don't miss what's next. Subscribe to Critical Path: