Hi, Thanks for subscribing. This is where I'll share [what readers can expect from your newsletter]. In this first issue: [write a sentence or two about what you'd like to share]. [Your content here. Type / on a new line to add images, buttons, and more.] [Your name]

Compute Atlas is a source-cited map and database of the U.S. compute build-out: data centers, crypto-mining sites and the power plants built to supply them, followed from proposal through operation or cancellation. Every record links to the public sources behind it. This briefing arrives every two weeks.

Where the atlas stands (as of November 11, 2026)

  • 3,174 sites in all 50 states, DC and 4 territories
  • 2,404 data centers, 539 power plants and 231 crypto-mining sites
  • 1,490 operational, 366 under construction, 276 permitted, 850 proposed and 192 cancelled

Added: 317 sites (October 28 to November 11)

215 data centers, 93 power plants and 9 crypto-mining sites. The most came from Minnesota (30), Iowa (23), Georgia (20), Missouri (19), New Mexico (18) and Ohio (18).

Changed status: 36 sites already on the map

  • 11 moved from proposed to permitted
  • 11 started construction
  • 1 came online
  • 1 operational site is now recorded as under construction
  • 12 were cancelled or withdrawn

33 projects recorded as cancelled

Twelve were already on the map; 21 were added already cancelled or withdrawn. Georgia and Wisconsin had four each, and Nevada, Virginia, Illinois and Iowa three each. The largest by planned capacity were the Henderson hyperscale data center and gas plant proposal in Nevada (1,000 MW), Project Boulder in South Carolina (1,000 MW) and the Nemadji Trail Energy Center gas plant in Wisconsin (550 MW).

One record: Project Boulder, Colleton County, South Carolina

A proposed 1,000 MW data center near the ACE Basin, the Ashepoo-Combahee-Edisto estuary, with no named tenant. If built, it would have been South Carolina's first gigawatt-scale data center. The Post and Courier reported on October 7, 2026 that the developer, Eagle Rock Partners, had abandoned the plan. The record cites six sources: https://www.compute-atlas.com/facilities/project-boulder-colleton-county-sc

The full dataset

Every record, every field and every source as weekly JSON and CSV files, with a changelog of what changed. Free for students, educators and academics; $150/month or $1,500/year for everyone else. The data stays CC BY 4.0, and the map and every facility page stay free for everyone. https://www.compute-atlas.com/data

Know of a site that's missing?

Send a link to a news article, permit filing or county agenda. No account needed; a person reviews every lead before it goes live. https://www.compute-atlas.com/contribute

Every change, with its sources: https://www.compute-atlas.com/activity

This newsletter is drafted with AI and reviewed by a person before it is sent.

Don't miss what's next. Subscribe to Compute Atlas:
www.compute-atlas.com
Bluesky
Powered by Buttondown, the easiest way to start and grow your newsletter.